10 705 713 622 ₸
current
"Reconstruction of heating networks of the lower zone of Aktau city with replacement of shut-off fittings
1 000 582 757 ₸
current
"Construction of heating networks (cofferdam) in Zhas Orken microdistrict in Petropavlovsk NKA".
157 137 042 ₸
current
Reconstruction of KNS-21 and pressure sewage collector to the dewatering well located at the intersection of Gagarina-Mendesheva street Uralsk WKO (see section 13 item 13.7 other conditions
1 195 258 230 ₸
current
Reconstruction of sewage networks, pressure sewage collector and sewage pumping stations KNS №1 and KNS №2 of Dubovka village of Abay district
748 968 595 ₸
current
Reconstruction of the main water pipeline on Kunayev Avenue DN 400-800 mm from Omskaya street to Abaya street Ekibastuz, Pavlodar region
2 540 854 162 ₸
current
Construction of a water pipeline in the village of Amankaragai, Auliekol district, Kostanai region
1 387 844 960 ₸
current
Construction and installation works under the project: "Reconstruction of the heating main on Yermekova street from ON-7 to TK20-GSh with connection of houses on Bobruyskaya street, Karaganda".
1 728 883 077 ₸
Development and arrangement of engineering and communication infrastructure of "Yuzhny" microdistrict in Petropavlovsk SKR. Water supply networks and roads
2022
677 286 390 ₸
Reconstruction of bypass sewage collector D 1000 mm from chamber No. 6 to regulating tank" Reconstruction of pressure sewage collector D 1000 mm along Saratov highway" Uralsk
2022
1 787 328 009 ₸
Construction and installation works for the project "Reconstruction of industrial water pipeline D-700 in Kostanay from the chamber of water treatment facilities to Doschanova Street".
current
287 533 255 ₸
Reconstruction of water supply networks (residual works) (Su-Arnasy) in Astana
2019
182 952 449 ₸
Contract works for the construction of facilities: "Reconstruction of heating mains 2 DN 300 mm in mkr. Molodezhny , Taha Hussein str., 3 Zh.Tashenova 4/1,9/4 in Astana
2019
318 174 478 ₸
Reconstruction of heating main No. 8 on Abulkhair Khan Ave. from Pavilion 5' to CHS-2 in 7 microdistrict and to TOP-15 in 6 microdistrict of Uralsk
2019
110 271 334 ₸
Contractor's work for the construction of the facility "Heating networks to the facility "Multifunctional ice palace, located in Astana, Turan avenue 57, on the left bank of the Ishim River
2019
327 788 068 ₸
Reconstruction of heating main No. 4 from point 1 on Chkalova St. to TP-4-14 on U. Gromova St. Gromovaya street Uralsk
2019
2 760 426 562 ₸
Reconstruction of the M3 main heat network to Pavilion 5. The section from pavilion 4 to Pavilion 5 (Karaganda, Chapaev str.)
2019
1 751 017 004 ₸
Reconstruction of the main heat network UU2 to TC-55 SE (Karaganda, Republic Ave.)
2019
1 589 944 350 ₸
Reconstruction of main heating network M3 to pavilion 5. Section from pavilion 3 to pavilion 4 (Karaganda, Chapaeva str.)
2018
761 153 160 ₸
Construction of engineering and transport infrastructure in the Industrial zone of Talgar district of Almaty region. Main water supply networks
2018
64 985 034 ₸
Contractor's work for the construction of the facility "Transfer to district heating of the 4-story building of the Scientific and Production Center of Transfusiology (formerly - the "Blood Center")
2017
54 807 857 ₸
Contractor's work for the construction of the facility "Heating networks to the "University campus KazGYU", located at: Astana, Esil district, Korgalzhynskoe highway house, 8".
2017
5 383 520 000 ₸
Construction and installation works for the facility: "Water supply, sewerage and electricity networks, landscaping. Engineering networks to individual housing east of Ilyinka settlement (1 stage) Astana.
2014
912 480 764 ₸
Construction and installation works on the object "Development and arrangement of engineering and communication infrastructure for residential housing in Kapshagay, Almaty region, microdistrict Arna
2018
609 629 206 ₸
Contractor works for construction of the facility "Construction of heating main along A. Moldagulova Street from junction with existing heating main TM-3 to junction with projected heating main 5 input TM-55 in Astana".
2017
426 451 805 ₸
Construction of engineering and communication networks for housing and communal services in Baiserke village of Iliysk district of Almaty region
2017
84 236 316 ₸
Expansion and reconstruction of TPP-2, heat networks and power grid facilities of Astana city (Heat networks. Adjustment (by lots) (Lot №3 ТМ-29. Construction of Seyfullina Street section. Reconstruction of heating main along Kv.99) 2DU 500, 2DU 300, 2DU 200, 2DU 150
2013
609 785 965 ₸
Construction of engineering infrastructures for residential buildings of Otyrar microdistrict of Turkestan city. Turkestan South-Kazakhstan
2017
144 081 238 ₸
Expansion and reconstruction of TETs-2, heating networks and power grid facilities in Astana (Heating networks. Adjustment (for lots) Lot No. 2 M-23. Section of the route on Munaitpasov Street)
2012
48 572 467 ₸
Construction of engineering networks for the development of the outskirts of the city (Heating networks for 15 individual private houses in the Kazakh village "Karaotkel," "microdistrict South-East" (right side) in Astana
2012
482 174 696 ₸
Expansion and reconstruction of TETs-2, heating networks and power grid facilities in Astana (Heating networks. Adjustment (for lots) Lot No. 2 M-23. Section of the route on Munaitpasov Street)
2012
2 088 288 460 ₸
Reconstruction of existing main heating networks in Astana (Lot No. 3 TM-3 from NS No. 1 to Potanin St. On May 9 with connection to the existing TM-12) (Reconstruction with complete replacement) 2DU 1000
2011
906 286 254 ₸
Engineering networks of Industrial Park - Teplomahistral TM 50, Astana 1st stage 2DU 1000, 2DU 800
2010
2 738 440 000 ₸
Construction of the heating main III-input from the TETs-2 to the left-bank part of Astana (Section of the route from TETs-2 to pavilion P-2, P-1, P-2) 2DU 1000
2009
1 002 640 000 ₸
Construction of the heating main III-input from the TETs-2 to the left-bank part of Astana (Jumper on pr. Abylaykhana, pavilion P-9) 2DU 700
2009
1 395 021 000 ₸
Section of the heating main from pavilion No. 2 to pavilion No. 3 at the facility "Heating main to the left-bank part of Astana - third input, South-East (left side) 2Du 500, 2DU 1000
2007
4 268 376 933 ₸
current
Construction of heating main 5-input. (Heat main to the left-bank part of Astana, 5th-inlet). Section of the route from CHP-3 to Constitution Street (with the building of the magnetic sludge trap)".
732 351 477 ₸
Construction and installation works on the facility: Construction of utilities to the Bereke residential area (Heating networks) in Kostanay
2022
669 508 357 ₸
Contractor's work "Construction of infrastructure of the new industrial zone (Industrial Park) in Astana. Stage 3. The third launcher complex
current
396 179 028 ₸
Construction and installation works for the project "Reconstruction of water supply networks in Dachny village of Arkalyk".
2021
2 785 677 988 ₸
Reconstruction and modernization of heating networks in Zhezkazgan (1st stage)

2021

902 733 364.51 ₸
Construction and installation works on the facility "Reconstruction of the water supply network D-500 mm on Uralskaya Street from the airport to 2nd Kostanay at the intersection of the street Station-Zhukovsky for water supply of the Industrial Zone"

2021

2 227 635 400 ₸
Reconstruction of water supply network D-600 mm from the territory of treatment plants to the intersection of Promyshlennaya Street - Gagarin Street in Kostanai for water supply of industrial area (construction and installation works)
2022
901 874 242 ₸
Reconstruction of the main water conduit Ø1020 mm between the 1st and 2nd ascents in Ekibastuz, Pavlodar region

2021

1 073 700 345 ₸
Reconstruction of bypass pressure sewage collector Uralsk WKO, III launching complex

2021

2 713 510 669 ₸
Contractor works "Construction and reconstruction of heat supply facilities. (Construction of heating main along Tlendiev Ave. for connection to district heating of residential complexes in Astana)".
2020
1 398 768 414 ₸
Contractor's works on construction of the facility "Reconstruction of ТМ-23 in Astana (Construction of heating main 2Du1000 mm at the site from PI-2 to Abylaykhan Ave., 2Du1000 mm on Kravtsova Street from BS № 6 to the junction with ТМ-26 on Balkashinsky Street) Plot from Tashenova Street to Huseyn Street
current
2 929 638 055 ₸
Contractor's work on reconstruction of the facility "Construction of TM-14" (Reconstruction of TM-14 2D 1000mm, in the city of Astana)
current
3 259 558 005 ₸
Contract work for the construction of the facility "Reconstruction of TM-15 in the city of Astana
2020
1 415 315 896 ₸
Construction of engineering and transport infrastructure for an industrial zone in Talgar district of Almaty region. Outdoor sewerage
2020
224 609 031 ₸
Reconstruction of sewage networks (residual works) (Su-Arnasy) in Astana
2020