"Reconstruction of heating networks of the lower zone of Aktau city with replacement of shut-off fittings
"Construction of heating networks (cofferdam) in Zhas Orken microdistrict in Petropavlovsk NKA".
Reconstruction of KNS-21 and pressure sewage collector to the dewatering well located at the intersection of Gagarina-Mendesheva street Uralsk WKO (see section 13 item 13.7 other conditions
Reconstruction of sewage networks, pressure sewage collector and sewage pumping stations KNS №1 and KNS №2 of Dubovka village of Abay district
Reconstruction of the main water pipeline on Kunayev Avenue DN 400-800 mm from Omskaya street to Abaya street Ekibastuz, Pavlodar region
Construction of a water pipeline in the village of Amankaragai, Auliekol district, Kostanai region
Construction and installation works under the project: "Reconstruction of the heating main on Yermekova street from ON-7 to TK20-GSh with connection of houses on Bobruyskaya street, Karaganda".
Development and arrangement of engineering and communication infrastructure of "Yuzhny" microdistrict in Petropavlovsk SKR. Water supply networks and roads
Reconstruction of bypass sewage collector D 1000 mm from chamber No. 6 to regulating tank" Reconstruction of pressure sewage collector D 1000 mm along Saratov highway" Uralsk
Construction and installation works for the project "Reconstruction of industrial water pipeline D-700 in Kostanay from the chamber of water treatment facilities to Doschanova Street".
Reconstruction of water supply networks (residual works) (Su-Arnasy) in Astana
Contract works for the construction of facilities: "Reconstruction of heating mains 2 DN 300 mm in mkr. Molodezhny , Taha Hussein str., 3 Zh.Tashenova 4/1,9/4 in Astana
Reconstruction of heating main No. 8 on Abulkhair Khan Ave. from Pavilion 5' to CHS-2 in 7 microdistrict and to TOP-15 in 6 microdistrict of Uralsk
Contractor's work for the construction of the facility "Heating networks to the facility "Multifunctional ice palace, located in Astana, Turan avenue 57, on the left bank of the Ishim River
Reconstruction of heating main No. 4 from point 1 on Chkalova St. to TP-4-14 on U. Gromova St. Gromovaya street Uralsk
Reconstruction of the M3 main heat network to Pavilion 5. The section from pavilion 4 to Pavilion 5 (Karaganda, Chapaev str.)
Reconstruction of the main heat network UU2 to TC-55 SE (Karaganda, Republic Ave.)
Reconstruction of main heating network M3 to pavilion 5. Section from pavilion 3 to pavilion 4 (Karaganda, Chapaeva str.)
Construction of engineering and transport infrastructure in the Industrial zone of Talgar district of Almaty region. Main water supply networks
Contractor's work for the construction of the facility "Transfer to district heating of the 4-story building of the Scientific and Production Center of Transfusiology (formerly - the "Blood Center")
Contractor's work for the construction of the facility "Heating networks to the "University campus KazGYU", located at: Astana, Esil district, Korgalzhynskoe highway house, 8".
Construction and installation works for the facility: "Water supply, sewerage and electricity networks, landscaping. Engineering networks to individual housing east of Ilyinka settlement (1 stage) Astana.
Construction and installation works on the object "Development and arrangement of engineering and communication infrastructure for residential housing in Kapshagay, Almaty region, microdistrict Arna
Contractor works for construction of the facility "Construction of heating main along A. Moldagulova Street from junction with existing heating main TM-3 to junction with projected heating main 5 input TM-55 in Astana".
Construction of engineering and communication networks for housing and communal services in Baiserke village of Iliysk district of Almaty region
Expansion and reconstruction of TPP-2, heat networks and power grid facilities of Astana city (Heat networks. Adjustment (by lots) (Lot №3 ТМ-29. Construction of Seyfullina Street section. Reconstruction of heating main along Kv.99) 2DU 500, 2DU 300, 2DU 200, 2DU 150
Construction of engineering infrastructures for residential buildings of Otyrar microdistrict of Turkestan city. Turkestan South-Kazakhstan
Expansion and reconstruction of TETs-2, heating networks and power grid facilities in Astana (Heating networks. Adjustment (for lots) Lot No. 2 M-23. Section of the route on Munaitpasov Street)
Construction of engineering networks for the development of the outskirts of the city (Heating networks for 15 individual private houses in the Kazakh village "Karaotkel," "microdistrict South-East" (right side) in Astana
Expansion and reconstruction of TETs-2, heating networks and power grid facilities in Astana (Heating networks. Adjustment (for lots) Lot No. 2 M-23. Section of the route on Munaitpasov Street)
Reconstruction of existing main heating networks in Astana (Lot No. 3 TM-3 from NS No. 1 to Potanin St. On May 9 with connection to the existing TM-12) (Reconstruction with complete replacement) 2DU 1000
Engineering networks of Industrial Park - Teplomahistral TM 50, Astana 1st stage 2DU 1000, 2DU 800
Construction of the heating main III-input from the TETs-2 to the left-bank part of Astana (Section of the route from TETs-2 to pavilion P-2, P-1, P-2) 2DU 1000
Construction of the heating main III-input from the TETs-2 to the left-bank part of Astana (Jumper on pr. Abylaykhana, pavilion P-9) 2DU 700
Section of the heating main from pavilion No. 2 to pavilion No. 3 at the facility "Heating main to the left-bank part of Astana - third input, South-East (left side) 2Du 500, 2DU 1000
Construction of heating main 5-input. (Heat main to the left-bank part of Astana, 5th-inlet). Section of the route from CHP-3 to Constitution Street (with the building of the magnetic sludge trap)".
Construction and installation works on the facility: Construction of utilities to the Bereke residential area (Heating networks) in Kostanay
Contractor's work "Construction of infrastructure of the new industrial zone (Industrial Park) in Astana. Stage 3. The third launcher complex
Construction and installation works for the project "Reconstruction of water supply networks in Dachny village of Arkalyk".
Reconstruction and modernization of heating networks in Zhezkazgan (1st stage)
Construction and installation works on the facility "Reconstruction of the water supply network D-500 mm on Uralskaya Street from the airport to 2nd Kostanay at the intersection of the street Station-Zhukovsky for water supply of the Industrial Zone"
Reconstruction of water supply network D-600 mm from the territory of treatment plants to the intersection of Promyshlennaya Street - Gagarin Street in Kostanai for water supply of industrial area (construction and installation works)
Reconstruction of the main water conduit Ø1020 mm between the 1st and 2nd ascents in Ekibastuz, Pavlodar region
Reconstruction of bypass pressure sewage collector Uralsk WKO, III launching complex
Contractor works "Construction and reconstruction of heat supply facilities. (Construction of heating main along Tlendiev Ave. for connection to district heating of residential complexes in Astana)".
Contractor's works on construction of the facility "Reconstruction of ТМ-23 in Astana (Construction of heating main 2Du1000 mm at the site from PI-2 to Abylaykhan Ave., 2Du1000 mm on Kravtsova Street from BS № 6 to the junction with ТМ-26 on Balkashinsky Street) Plot from Tashenova Street to Huseyn Street
Contractor's work on reconstruction of the facility "Construction of TM-14" (Reconstruction of TM-14 2D 1000mm, in the city of Astana)
Contract work for the construction of the facility "Reconstruction of TM-15 in the city of Astana
Construction of engineering and transport infrastructure for an industrial zone in Talgar district of Almaty region. Outdoor sewerage
Reconstruction of sewage networks (residual works) (Su-Arnasy) in Astana